  1. Install sidewalk – 387
  2. Re-do ceiling in 378-3
  3. Replace fascia for PB 15 & PB 16
  4. Replace termite window frames – 392
  5. Replace 380 men’s room door jams
  6. Gut out storage for office – 385C – DMA
  7. Install wall for 381- 12/13
  8. Retile 379A – 6A, 6B, & 4. Changed to rooms 4 & 5
  9. Covers/roofs for outdoor AC farms – 387/388/397
  10. Replace/resurface/paint doors/trim – 380.8 completed
  11. Replace hand rail – 385B
  12. Install rails for janitor shack ramp
  13. Cover/roof for 397-handicap ramp
  14. Cement around 378-ground drain
  15. Replace 378 hall door jams
  16. Install skirt for MPA
  17. Replace damaged ceiling – 382
  18. Gut 386 8, 9, 10, construct 2 storage units upstairs for VP’s Office
  19. Install locksmith’s door – 392
  20. Re-roof 386B storage shed